← BACK TO PORTFOLIO
Sutton Gas + Solar + Storage.
>300 MW of confirmed gas delivery capacity directly off I-10 between Houston and El Paso. Gas, water, solar, and fiber all on-site, complete behind-the-meter package. Landowner has confirmed openness to SMR development. Adjacent 750 MW NextEra wind lease (COD 2028) offers redundancy. Suited for on-site manufacturing and modular data center development.
000MW+
Confirmed Gas-Supported Delivery Capacity
GAS TURBINE · CONCEPT · SUTTON · GAS + SOLAR + STORAGE
ENVIRONMENT Built With the Community
Built clean. Built in America.
Solid Oxide Fuel Cells deliver approximately 99% lower NOx than gas turbines, scaling clean dispatchable capacity on confirmed gas supply. Factory-built modular data centers cut on-site construction, waste, and delivery time by 40–50%, and immersive cooling means no public drinking water in operations. The solar field is built on Suniva cells, made in America.