Dual-Market/Floyd County · 765 kV Upgrade 2027

Project 1541 Flexible power campus.

765 kV transmission upgrade planned for 2027 along the TUCO-Oklaunion North corridor, dual market access to SPP and ERCOT. Landowner has signed LOI for small modular reactor development on-site. Seven on-site Ogallala wells totaling 1,440 GPM (375–400 ft) with expansion potential. Atmos gas on-site and a 24-inch ONEOK trunk line 16.5 miles west. Suited for on-site manufacturing and modular data center development.

Potential Generation Technologies
Gas GenerationSolarBattery StorageSOFCSMR Optionality

Potential technologies are shown for planning only. Final configuration will be determined through engineering, permitting, interconnection, fuel availability, and customer load requirements.

000kV
Transmission Upgrade · SPP + ERCOT Dual-Market 2027
Visit the Project Site →
765 kV TRANSMISSION · CONCEPT · PROJECT 1541 · 765 KV CORRIDOR
765 kV BACKBONE · ERCOT + SPP DUAL-MARKET ACCESS

Illustrative concept only — final generation configuration is subject to engineering.

Built clean. Built in America.

Potential configurations may combine dispatchable generation, solar, battery storage, and SOFCs to meet customer load requirements. Final technology selection, cooling design, and equipment layout are subject to engineering, permitting, interconnection, and resource studies. Where solar is selected, U.S.-made Suniva cells are the preferred basis.

Solar Option · U.S.-Made CellsFactory-Built Modular DCSOFC Option · ~99% Lower NOxClosed-Loop Cooling OptionsNo Public Drinking WaterNo Impact on Residential Rates