Largest Texas Site/West of the Pecos · Culberson County, TX · ERCOT West

West of the Pecos Firm power, behind the meter.

1.2 GW of firm behind-the-meter generation in phase one, with Block A targeting COD in Q4 2027. Full ~15,300-acre tract under option in the Delaware Basin. Suited for on-site manufacturing and modular data center development.

0.0GW
Firm Phase One · Block A COD Q4 2027 · 15,300-acre Tract
Visit the Project Site →
SUNIVA CELL PRODUCTION · NORCROSS, GA
U.S.-made Suniva solar cells in production
PHOTO · U.S. DEPARTMENT OF ENERGY

Built clean. Built in America.

Factory-built modular data centers cut on-site construction, waste, and delivery time by 40–50% versus traditional builds. Immersive cooling is designed for far West Texas water constraints, with no public drinking water used in operations, and Solid Oxide Fuel Cells deliver approximately 99% lower NOx than gas turbines. The solar field is built on Suniva cells, made in America.

Suniva · U.S.-Made CellsFactory-Built Modular DCSOFC · ~99% Lower NOxImmersive CoolingNo Public Drinking WaterNo Impact on Residential Rates