← BACK TO PORTFOLIO
Largest Texas Site/West of the Pecos · Culberson County, TX · ERCOT West

West of the Pecos Flexible power campus.

Firm behind-the-meter generation is planned for phase one, beginning with Block A. Full ~15,300-acre tract under option in the Delaware Basin. Suited for on-site manufacturing and modular data center development.

Potential Generation Technologies
Gas GenerationSolarBattery StorageSOFC

Potential technologies are shown for planning only. Final configuration will be determined through engineering, permitting, interconnection, fuel availability, and customer load requirements.

~00,000ac
Tract Under Option · Firm Phase One · Block A
Visit the Project Site →
SUNIVA CELL PRODUCTION · NORCROSS, GA
U.S.-made Suniva solar cells in production
PHOTO · U.S. DEPARTMENT OF ENERGY

Illustrative concept only — final generation configuration is subject to engineering.

Built clean. Built in America.

Potential configurations may combine dispatchable generation, solar, battery storage, and SOFCs to meet customer load requirements. Final technology selection, cooling design, and equipment layout are subject to engineering, permitting, interconnection, and resource studies. Where solar is selected, U.S.-made Suniva cells are the preferred basis.

Solar Option · U.S.-Made CellsFactory-Built Modular DCSOFC Option · ~99% Lower NOxClosed-Loop Cooling OptionsNo Public Drinking WaterNo Impact on Residential Rates