Opportunity Zone/Crosby County · CREZ Cottonwood Corridor

Estacado Flexible power campus.

Approximately 1,046 acres on the CREZ Cottonwood-Dermott 345 kV corridor (Operating). Texas Solar Nova 1 & 2 are already interconnected at the same substation. Opportunity Zone designation. A transmission upgrade is planned on the same corridor that serves Project 1541. Suited for on-site manufacturing and modular data center development.

Potential Generation Technologies
Gas GenerationSolarBattery StorageSOFC

Potential technologies are shown for planning only. Final configuration will be determined through engineering, permitting, interconnection, fuel availability, and customer load requirements.

000kV
Operating CREZ Corridor · Texas Solar Nova 1 & 2 Interconnected
Visit the Project Site →
BATTERY STORAGE · CONCEPT · ESTACADO
POTENTIAL SOLARGRID · CREZ 345 kVBESS 01BESS 02BESS 03CHARGE ← SOLAR · DISPATCH → GRIDPOTENTIAL BATTERY STORAGE · OPPORTUNITY ZONE

Illustrative concept only — final generation configuration is subject to engineering.

Built clean. Built in America.

Potential configurations may combine dispatchable generation, solar, battery storage, and SOFCs to meet customer load requirements. Final technology selection, cooling design, and equipment layout are subject to engineering, permitting, interconnection, and resource studies. Where solar is selected, U.S.-made Suniva cells are the preferred basis.

Solar Option · U.S.-Made CellsFactory-Built Modular DCSOFC Option · ~99% Lower NOxClosed-Loop Cooling OptionsNo Public Drinking WaterNo Impact on Residential Rates